View Full Version : Lake Champlain Bridge at Crown Point Implosion
snowman
12-23-2009, 08:29 AM
Today is the day they implode the closed bridge at Crown Point. There is supposed to be a live web cast. I can't find the exact link yet, but here is info.
http://adirondackdailyenterprise.com/page/content.detail/id/510357.html?nav=5008
sad to see it go, but would rather have a bridge that is usable.
Danzilla
12-23-2009, 10:26 AM
Crazy. Wife and I were just up in Burlington for our anniversary in October and went over that bridge. I think it closed within a week or two after that.
I hope the one they put in its place is somewhat pretty and not just a slab of concrete.
Snowballs
12-23-2009, 10:36 AM
Crazy. Wife and I were just up in Burlington for our anniversary in October and went over that bridge. I think it closed within a week or two after that.
I hope the one they put in its place is somewhat pretty and not just a slab of concrete.
Actually, it's both. The drawing they showed has very nice lines and looks like it's that prefab/engineered/reinforced concrete.
The implosion has been postponed till Wednesday.
nyspnypd
12-23-2009, 04:57 PM
Bridge Demolition is now Monday. View it live here or I am sure there are other sites.
http://wnyt.com/article/stories/S1327299.shtml?cat=10114 :)
Powered by vBulletin® Version 4.2.5 Copyright © 2024 vBulletin Solutions Inc. All rights reserved.